Case Study

Dar El Fouad Hospital

Electrical Network Optimization

Dar El Fouad

Dar El Fouad

Healthcare

2 days

The Challenge

What our client was facing

The hospital’s low voltage (LV) side lacked redundancy due to an initial design error. A short circuit in the LV busbar had a critical impact, triggering upstream medium voltage protection and disrupting the transformer. This posed a major risk to continuous power supply a vital need in a healthcare facility.

Our Solution

How we solved the problem

Pro Serve conducted a thorough technical study and implemented a solution by re-routing cables between two independent power sources, effectively introducing redundancy without major infrastructural changes. In addition, comprehensive preventive maintenance and electrical testing were performed to enhance the reliability and safety of the system.

Pro Serve delivered exactly what they promised a major electrical upgrade without interfering with patient care. Lacking redundancy in the LV side of the network due to an initial design mistake made it difficult to maintain normal electricity flow, often requiring the use of generators. Pro Serve’s technical study found a way around this by shifting cables between two independent sources, effectively resolving the issue. Their preventive maintenance and testing made a real difference in keeping our system compliant and reliable.
F

Facilities Manager

Dar El Fouad

Products Used

* Medium Voltage Cables

Services Provided

* Breaker Timing & Contact Resistance Tester * Transformer Turns Ratio & Winding Resistance Tester * Preventive Maintenance * Electrical Testing * Network Redundancy Engineering

Need Similar Results?

Let's discuss how we can help your business achieve success.

Ready to Start Your Success Story?

Partner with ProServe for exceptional industrial solutions and support.

Start Your Project